National Tri Generation CHP company Riyadh | Kings Road Tower, Malik road - Jeddah Reference photos attached | We inserted and installed 42 ton chiller from the side of the building |
National Tri Generation CHP company Riyadh | Kings Road Tower, Malik road - Jeddah Reference photos attached | Supply and Installation of cooling water and chilled water supply and return pipe lines inside the service building |
Saudi Cranes, Jubail | Ref photo attached | Installed and commissioned more than 80 EOT cranes of different capacities, spans, long travel lengths and lifting heights in the eastern province and central province |
ETA Jeddah | | Supply and installation of 42m height steel structure for external lift in Saudi cable Company |
Saudi Cable Co Power cable division | | Strengthening of existing concrete floor with steel joist and chemical anchors in the CV tower building |
Saudi Cable Co Power cable division | | 80m long parabolic shaped catwalk for CV line2 |
Saudi Cable Co Power cable division | | Support structure for KTK( German) Wire stranding machine |
Saudi Cable Co Power cable division | | Supply and installation of 800m long supply and return cooling water pipe line system for CV line 2 |
Saudi Cable Co Power cable division | | Supply and installation of guide rollers and support platforms for 176 baskets Milliken Drum Twisting machine |
INDIPCO Jubail | Al Saleem Corporation | Took part in the erection of 34000 sqm industrial structure of Al MEHMUT as a subcontractor. • We Installed three bays of 24m span and 350m long |
ABB Jubail | | Design , supply and installation of columns and gantry beams inside the existing structure for 10 ton EOT crane operation |
Al Naba Cont. Enterprises Jubail | | Shop drawing , fabrication , galvanizing and supply of 110 tons of steel structural members for transformer rooms at SAUDI KAYAN, Jubail |
NCB IT center Balad, Jeddah | National Trigeneration Co Riyadh | Installation of supply and return pipe lines for the additional new chiller |
NCB It center Balad , Jeddah | Al Angari Contracting Jeddah | Installation of 35mspan arch wooden bridge in Shara Hail at Balad near NCB building |
Balubaid (phase 1), Jeddah | | Supply and installation of steel storage tanks and blending kettles for engine oil factory |
Mobile Oil (Phase 5), Jeddah | | Fabrication work (Steel Tank) |
Halwani Industrial complex Industrial area Phase 4Jeddah | Allied Engineering Enterprises Jeddah | Erection of pre engineered steel structure and sandwich panel roof and wall cladding. Supply and installation of bollard , barricades, chiller platforms etc ( under progress) |
Jet aviation storage facilty Taif Airport TAIF | Arabian Peroleum Supply Company | Removed the old storage tanks, notified them and re installed. Supplied and installed new off loading and loading pipelines for supplying fuel to the bridge trekker vehicles. |